Abstract
The study investigates how events arising during the preparation and delivery of construction projects lead to time and cost effects, and what evidence distinguishes a demonstrated causal relationship from a merely possible one. The source collection comprised 87 expert reports, preliminarily grouped into 80 independent matters and containing 950,929 words. Ten maximally varied cases, represented by 14 reports and 299,624 words, were selected for in-depth analysis. Thirty-five causal sequences were reconstructed using five elements: initiating event, participant response, change in the actual course of the works, and separate assessments of schedule and cost effects. Design documentation and design issues initiated 28.6% of the causal sequences, while access, decisions and approvals initiated 22.9%. The two most common ways in which effects arose were changed, additional or repeated work (34.3%) and the absence of conditions necessary to proceed (25.7%). Among the 29 sequences in which schedule effects were assessed, 15 effects were demonstrated and six were considered probable. In all eight cases classified as possible, not established, absent or not independently attributable, the effect on the critical path was missing or explicitly excluded. Supplementary expert reports further showed that new evidence may revise the magnitude of an effect without changing how it arose, or may require an earlier attribution of delay to be withdrawn. The findings support assessing construction disputes through reconstructed causal sequences instead of directly associating an event with delay or cost growth.
References
2. Beach, D., and Pedersen, R. B. (2019). Process-Tracing Methods: Foundations and Guidelines. 2nd edition. Ann Arbor, MI: University of Michigan Press. https://doi.org/10.3998/mpub.10072208
3. González, P., González, V., Molenaar, K., and Orozco, F. (2014). Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, 140(1), 04013027. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000721
4. Kog, Y. C. (2018). Project Management and Delay Factors of Public Housing Construction. Practice Periodical on Structural Design and Construction, 23(1), 04017028. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000350
5. Li, Y., and Taylor, T. R. B. (2014). Modeling the Impact of Design Rework on Transportation Infrastructure Construction Project Performance. Journal of Construction Engineering and Management, 140(9), 04014044. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000878
6. Love, P. E. D., Edwards, D. J., Smith, J., and Walker, D. H. T. (2009). Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects. Journal of Performance of Constructed Facilities, 23(6), 480–488. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000054
7. Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., and Irani, Z. (2002). Using systems dynamics to better understand change and rework in construction project management systems. International Journal of Project Management, 20(6), 425–436. https://doi.org/10.1016/S0263-7863(01)00039-4
8. Love, P. E. D., Matthews, J., Sing, M. C. P., Porter, S. R., and Fang, W. (2022). State of Science: Why Does Rework Occur in Construction? What Are Its Consequences? And What Can be Done to Mitigate Its Occurrence? Engineering, 18, 246–258. https://doi.org/10.1016/j.eng.2022.05.010
9. Maemura, Y., Kim, E., and Ozawa, K. (2018). Root Causes of Recurring Contractual Conflicts in International Construction Projects: Five Case Studies from Vietnam. Journal of Construction Engineering and Management, 144(8), 05018008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001523
10. Odeh, A. M., and Battaineh, H. T. (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5
11. Patton, M. Q. (2015). Qualitative Research & Evaluation Methods: Integrating Theory and Practice. 4th edition. Thousand Oaks, CA: SAGE Publications. ISBN 978-1-4129-7212-3. https://www.sagepub.com/shop/buy-a-book/book232962 (accessed: 28.08.2026).
12. Sambasivan, M., and Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
13. Society of Construction Law (2017). Delay and Disruption Protocol. 2nd edition. Hinckley: Society of Construction Law. https://www.scl.org.uk/sites/default/files/documents/SCL_Delay_Protocol_2nd_Edition_Final.pdf (accessed: 28.08.2026).
14. Sun, M., and Meng, X. (2009). Taxonomy for change causes and effects in construction projects. International Journal of Project Management, 27(6), 560–572. https://doi.org/10.1016/j.ijproman.2008.10.005
15. Yin, R. K. (2018). Case Study Research and Applications: Design and Methods. 6th edition. Thousand Oaks, CA: SAGE Publications. ISBN 978-1-5063-3616-9. https://www.sagepub.com/en-us/nam/case-study-research-and-applications/book250150 (accessed: 28.08.2026).
16. Zhang, S., Sunindijo, R. Y., Wang, J., Su, Z., Ke, Y., and Liu, X. (2025). The Causation of Design Error in the Construction Industry: A Multistakeholder Perspective. Journal of Performance of Constructed Facilities, 39(1), 04024055. https://doi.org/10.1061/JPCFEV.CFENG-4862

This work is licensed under a Creative Commons Attribution 4.0 International License.